Closing up shaft entrance to do maintaince, the access cut was 30"x10', the prop just arrived for install from the Shop 31.
All Shalf Sections were removed and ballanced, Shaft Bearings were removed and resurfaced with babbit, all Shaft Connection 5"OD bolts remanufactured reguardless and x-rayed, all spects identified and confermed to spects, sturctural inspections peformed, and the sand blasting/painting of the Shaft Ally.
(1)
Comment
(0)
PO1 William "Chip" Nagel
PO1 William "Chip" Nagel
7 mo
SGT (Join to see) They do Look Beautiful Brand New!
(1)
Reply
(0)
SGT Program Coordinator
SGT (Join to see)
7 mo
PO1 William "Chip" Nagel - When I saw the riggers I asked them, "Does anyone know how much do they pay for scrap brass?" Lol